Here you will find a selection of our completed projects in sectors such as steel production, ports, and infrastructure. Each project demonstrates how we contribute to efficient and sustainable rail systems with customization and precision.
Project: Crane Rail Repair Rotterdam
Location:
Rotterdam
Performed Work:
- Measuring the crane rail
- Installing a splice to replace a broken weld
Brief Summary:
In Rotterdam, we repaired a crane rail by carefully measuring and installing a splice as a replacement for a broken weld. This provided a quick and durable solution to restore the crane’s safe and reliable operation.
Project: Rail Renewal Duffel
Location:
Duffel
Performed Work:
- Replacement of 2×180 meters A65 rails
- Work carried out at height and in difficult-to-reach locations
Brief Summary:
In Duffel, we renewed 2×180 meters of A65 rails at height and in hard-to-reach places. Thanks to our experience and expertise, we carried out this challenge efficiently and according to the highest standards.
Project: Rail Renewal Geldermalsen
Location:
Geldermalsen
Performed Work:
- Replacement of 150 meters A65 rails
- Installation on H-beams
- Placement of rubber underlays
Brief Summary:
In Geldermalsen, we successfully renewed 150 meters of A65 rails. The rails were mounted on H-beams with a rubber underlay for optimal damping and durability, fully tailored to the specific requirements of the location.
Project: Rail Renewal Antwerp
Location:
Antwerp
Performed Work:
- Replacement of 80 meters MRS 125 rails
- Installation of new base plates
- Application of new resin bedding
Brief Summary:
In Antwerp, we renewed 80 meters of MRS 125 rails. The project involved the installation of new base plates and the application of resin bedding, which provides additional stability and a longer lifespan for the rail system.
Project: Rail Renewal Geertruidenberg
Location:
Geertruidenberg
Performed Work:
- Replacement of 2×180 meters S30 rails
- Installation of base plates
- Application of resin bedding at height
Brief Summary:
In Geertruidenberg, we replaced 2×180 meters of S30 rails. The project included the installation of base plates and the application of resin bedding at height, ensuring a stable and durable rail system.